Balkan Plumbing

On city streets traffic flow disruptions have huge costs, removing the need for lane closures and increasing the speed and safety of putting them back in service was the top priority of the initiative.

Balkan Plumbing

Oxford Plastics are proud to provide a detailed case study explaining how our work with Balkan Plumbing allowed them to significantly reduce unnecessary expenditure and seamlessly speed up their workflow.

Balkan Plumbing is the largest sewer and water main specialists in New York, and has been for over 30 years. On a daily basis, Balkan Plumbing of NYC deploy multiple crews to install, repair and maintain water and sewer connections between the main lines and homes/buildings. The excavations require a temporary cover prior to the work being completed and the road surface restored.

Prior to the involvement of Oxford Plastics, Balkan used steel road plates delivered from their service yards to ‘safely’ cover a trench. However, they found this process itself came with its challenges:

  • Additional workers required – due to the weight of the steel plates, they required at least two people to help lift these. This then, in turn, led to a reduction in profit due to the labour-power required.
  • Heavy lifting equipment – specialised equipment was also required for the heavy lifting of these steel plates into place. The steel road plates would then also need to be anchored and edged into place to ensure a seamless transition from street to plate.
  • Specialised transportation – transporting the steel road plates from yard to site also required specialised transport which, again, led to additional costs.
  • Extra costs – not to mention the above costs of transport and workers, but inconveniencing the public also came with its costs – as well as opening up the potential for accidents to happen.

With numerous other disadvantages of using steel road plates, including noise pollution, street closures and reduction in profit due to labour-force required, something needed to be done.

That’s where Oxford Plastics – and our composite plastic road plates – came in, offering safety, savings and simplicity.

The Process

Oxford Plastic’s plastic road plates and trench covers are able to support a crew of 4-6 workers. The team are dispatched into two trucks along with the equipment required to carry out an excavation. The excavation is carried out with a jack hammer and shovels, which is followed by the repair of the line and/or connection. Back filling and restoration of the asphalt roadway is then done. If the works require additional days, plating is needed to allow traffic access.

By using Oxford Plastics, the process itself has been simplified – meaning fewer workers are required, the set-up speed is faster and easier, the road plates are more secure and there’s less noise pollution. Learn more about the benefits of composite road plates from our guide.

Balkan Plumbing
The largest sewer and water main specialist in New York

Oxford Plastics has made our operations more efficient, safer and more profitable.

Dave Balkan
CEO

Testimonial from Balkan's CEO

We spoke to Dave Balkan, CEO of Joseph L Balkan Plumbing – who explained how Oxford Plastics has transformed their operations:

“Oxford Plastics has made our operations more efficient, safer and more profitable.

“Prior to using the composite plates, we’d sometimes have a 3-hour notice on a job – meaning we had to solve urgent problems using steel plates. This would mean we would need to open our facilities (which aren’t always open), move equipment and get to where the steel plates were stored.

“Then, loading up steel plates alone would need at least two guys to move them – and then we’d need to go out to a drop site and install them. All this would mean it would be unlikely that we’d meet the 3-hour deadline – which could result in a $1,200 summons.

“However, now we use Oxford Plastics plates, we are able to meet the deadline in less than an hour with no stress, no injury and no worry – knowing that everything will be easily taken care of.”

More Case Studies

Supply Chain Sustainability School

Supply Chain Sustainability School

Circularity and sustainability are central to Oxford Plastic's identity as a family-run SME. Our customer, Speedy, approached...

Harris Water Mains Improve Public Safety

Harris Water Mains Improve Public Safety

4th Generation New York water and sewer contractor Harris Water Mains prioritizes public safety by making the switch to compo...

Barhale Reduces Carbon Footprint with Oxford Plastics' Composite Road Plates

Barhale Reduces Carbon Footprint with Oxford Plastics' Composite Road Plates

Learn how Barhale reduced their carbon footprint, improved efficiency and increased safety when trialling the LowPro range at...