How to install trench covers

The LowPro range of trench covers has been designed with ease of use in mind. Whether you’re using the LowPro 11/11, LowPro 12/08 or LowPro 15/10 this guide will explain just how simple they are to install.

Step one: Measure your trench

Measure the dimensions of the trench, both width and length so you can calculate how many trench covers you’ll need for the job.

Step two: Choose your trench cover

Selecting the right trench cover for the job is important, if the trench cover does not properly cover the width of the trench, there can be gaps or exposed edges which can become a trip hazard. Additionally, if the trench cover can’t handle the load, it can break or collapse resulting in accidents or injuries.

Trench Size

Load Bearing Capacity

Product of Choice

Up to 27 inches

Up to 880lb

LowPro 11/11

Up to 27 inches

Up to 880lb

LowPro 12/08

Up to 27 inches

Up to 3.5t

LowPro 15/10

Up to 35 inches

Up to 880lb

LowPro 12/08

Up to 35 inches

Up to 880lb

LowPro 15/10

Up to 47 inches

Up to 880lb

LowPro 15/10

 

Step three: Prepare the trench

Before installing the trench it’s important to make sure the trench is clean and free of any debris and loose materials. A clean surface will allow for a stable installation.

You should also check the edges of the trench cover for signs of damage. If there is any damage to your trench cover then you should not use it.

Step four: Prepare the infill strips (if required)

Unscrew the plate and bolts at each end of the infill and insert the plate through the bolt hole. Then, insert the 2nd plate into the bolt hole on the long or short side.

Step five: Move the trench covers into position

The LowPro 11/11 is designed to be used without infills to cover trenches up to 27 inches wide. The LowPro 12/08 and LowPro 11/11 can be lifted and installed by just one person, while the LowPro 15/10 is a two-person lift. 

Place the LowPro composite trench cover with the plates inserted over the trench.

Step six: Repeat

Place the next LowPro in line with the first over the infill plate and ensure the LowPro is sitting on the plate at both ends.

Step seven: Add infill strips

Place the infill strip between the LowPro’s and secure it in place with the two bolts at either end.

Step eight: Repeat

Repeat as required until the whole trench is fully covered.

Working in trenches is one of the most dangerous construction operations, ensure trench safety by reading our guide today. And discover the full LowPro range or contact our helpful team today

Related News

What is closed-loop manufacturing?

What is closed-loop manufacturing?

What is closed-loop manufacturing? Closed-loop manufacturing is a process that reuses, recycles, and repurposes materials to...

Health and Safety Calendar 2024 US

Health and Safety Calendar 2024 US

For over three decades, we have prioritized safety in all our innovations. That’s why we’ve compiled a list of es...

2023 a success for Oxford Plastics

2023 a success for Oxford Plastics

As we enter 2024, as a business we’d like to reflect on the year we’ve had and look to our future goals. We&rsquo...